19.9 C
Belgrade
Supported byspot_img
spot_img

Amulsar Armenia faces more legal challenges

Member of Europium Groupspot_img
Supported byspot_img

Amulsar gold mine in Armenia has more legal challenges because of complaint filed questioning loans. The beleaguered Amulsar gold mine in Armenia broke rules attached to two loans totalling EUR 11 million it received in 2017 and 2009 from the European Bank for Reconstruction and Development, alleges a new complaint from 23 people living near the project and Armenian and international civil society groups including CEE Bankwatch Network.

The complaint details how the planning and construction of the gold mine near Jermuk in southern Armenia excluded public opinion during consultations over the project, damaged the town’s tourism potential and reputation as a spa destination, and polluted nature and precious water resources in the pristine area.

Locals fear that pollution caused by the ongoing works on the mine and planned extraction of gold with cyanide leaching will damage subsistence agriculture that many rely on for their livelihoods and potentially flow into Lake Sevan, the largest freshwater reserve in the Caucasus. The complainants are asking the bank’s accountability mechanism to assess whether the project complied with EBRD policy requirements to protect environmental and social rights and if not, recommend that the bank withdraw from the project.

Supported by

This latest complaint adds to the woes of Amulsar’s owner Lydian International. In January 2020, the company was delisted from the Toronto Stock Exchange and subsequently filed for bankruptcy protection.

Lydian has also been the focus of previous complaints to development lenders and international bodies, including 2014 complaints to both the EBRD and the International Finance Corporation and to the Bern Convention on the Conservation of European Wildlife and Natural Habitats this year.

Fidanka McGrath, Bankwatch EBRD policy officer said, “The bank missed the opportunity to act when the first complaints were raised in 2014. Even though construction work has begun and irreversible damage has been done, the bank should take action to stop any more destruction. The bottom line is that there is no support for this project among those who will be most greatly affected by the mine as demonstrated by a 3000 strong petition for a mine-free Jermuk by local people.”

Source: bankwatch.org

 

 

 

 

Supported byElevatePR Digital

Related News

Overcoming the copper supply challenge: Implications for U.S. renewable energy goals

A recent University of Michigan study sheds light on a concerning gap in copper production essential for meeting renewable energy targets in the United...

Unlocking renewable energy potential: The role of renewable hydrogen in storage and decarbonization

Renewable electricity can be effectively stored by converting it into renewable hydrogen or ammonia through the process of electrolysis. These fuels can be utilized...

Empowering renewable energy: Harnessing the potential of renewable hydrogen for storage and decarbonization

Batteries play a crucial role in providing short-term flexibility to the energy system, offering advantages such as geographical and sizing flexibility. Unlike some other...

Energy storage: Enabling clean alternatives and job creation in coal-dependent regions

Energy storage is particularly relevant to carbon-intensive and coal regions, as it provides a cleaner alternative to hard-to-abate industries and traditional fossil-fuel-powered thermal plants...
Supported by
Supported by
Supported by
error: Content is protected !!