-1.4 C
Belgrade

Adriatic finds high-grade precious metals at Rupice Bosnia mine

-Adriatic Metals has discovered high-grade precious metal intercepts from a number of drill holes at its Rupice Project in Bosnia and Herzegovina

-The Ministry of Forestry, Agriculture and Water Management asked the company that all areas of disturbance in the Zenica-Doboj Canton forest must be inspected

-Adriatic said the approvals are taking longer than expected but the company will continue to drill where it’s allowed

Adriatic Metals (ADT) has received assay results from a number of drill holes at its Rupice Project in Bosnia and Herzegovina.

In June, the Ministry of Forestry, Agriculture and Water Management requested that all areas of disturbance in the Zenica-Doboj Canton forest be inspected.

The areas will be inspected by the Ministry and the Forestry Departments of Zavidovici, Kakanj and Vareš. Construction will only commence after ministry approval. Adriatic says that the procedure is straightforward and is not expected to cause significant delays to field activities. However, the committee has taken some time with the results. This has led the company to only drill north and south of the Jurasevac-Brestic, prospect, with the majority of drilling confined to existing drill pads.

“Whilst our drilling of the extensions of the Rupice mineralisation has been restricted to just a few holes to the north and south while we awaited Forestry approval for access,” CEO Paul Cronin said.

“Our results continue to confirm that the mineralisation continues north into the new licence extension area, and south towards our Jurasevac-Brestic prospect over an open strike length of 500m,” he added.

Results of gold and silver grades in the north include 6 meters at 11.3g/t of gold, 1,019g/t of silver, 13.1 per cent of zinc, 12.3 per cent of lead, and 1.3 per cent of copper from 238 metres.

Testing results from the south include 8 metres at 0.72g/t gold, 70g/t silver, 2.3 per cent of zinc, 2.0 per cent of lead, 0.6 per cent of copper and 58 per cent of Barium sulfate 240 meters.

“The delay has given us the opportunity to improve our drill coverage to provide a better understanding of the geotechnical and structural characteristics of our deposit which has greatly assisted our mining studies and the Scoping Study,” he said.

Drilling will continue at both the Rupice deposit and the Jurasevac-Brestic prospect.

Source: themarketherald.com.au

Related News

India set to decide on import restrictions for metallurgical coke

India is set to make a decision soon on whether to implement import restrictions on metallurgical coke, a crucial ingredient in steelmaking. According to...

AMMC targets major production milestones by 2030 with ongoing development projects

Almalyk Mining and Metallurgical Combine (AMMC) has set ambitious production goals for 2030, aiming to achieve annual output of 500,000 tons of copper, 50...

Kazatomprom partners with Jordan uranium mining company on joint uranium exploration and extraction

Kazatomprom, Kazakhstan's national atomic company, has entered into a collaboration with Jordan Uranium Mining Company (JUMCO) to jointly explore and extract uranium in Jordan....

Saudi Arabia boosts mining sector to secure global mineral supply and support clean energy transition

As part of Saudi Arabia’s Vision 2030 initiative, the country is making significant strides toward creating a sustainable economy driven by clean energy. To...
error: Content is protected !!