19.7 C
Belgrade
Supported byspot_img
spot_img

40m EUR Lithium Extraction Optimisation Plant opened by Vulcan Energy

Member of Europium Groupspot_img
Supported byspot_img

Yesterday was a special one for the team at Vulcan Energy Resources, after years of intense hard work, including 10,000s of hours of pilot plant operation, as well as engineering and construction.

It was also a special day for Europe, Germany and France, and their close relationship with Australia. Together, this collaboration of cultures and technologies has produced Europe’s first fully domestic lithium production plant, our 40m EUR Lithium Extraction Optimisation Plant (LEOP), which we formally opened yesterday.

Instead of importing critical raw materials for Battery Electric Vehicles from overseas, at high cost to the environment and geopolitical supply chain vulnerability, LEOP produces lithium salts from the deep brine resource right under our feet in the Upper Rhine Valley. The by-product from this process? Renewable heat for our local communities.

Supported by

We were honoured to be joined by political leaders from the region and from the permitting authorities, and were grateful for the very strong words of support. We were also thankful to be joined by our strategic partners, including Stellantis, Umicore and Volkswagen, and many other distinguished guests.

It is a privilege to have the opportunity to physically build a new lithium supply for Europe for electric vehicles, to have a meaningful, generational effect on supply chain independence, and to be able to do it with world-leading environmental standards. It is also a massive privilege to do this with amazing, talented people at Vulcan Energy Resources, who work incredibly hard every day, and who are so passionate at what they do.

Under the excellent leadership of our highly capable MD-CEO Cris M., the next six-seven months will be transformational for Vulcan, as we complete the financing for Phase One of the ZERO CARBON LITHIUMâ„¢ Project, and start building our full-sized commercial plant. This will supply enough lithium hydroxide for 500,000 electric vehicles per annum, an amazing feat!

Here’s to the next chapter for decarbonising lithium. Onwards!

Source: Vulcan Energy Resources

Supported byElevatePR Digital

Related News

Rio Tinto challenges Serbian government with arbitration notice on Jadar project

Background of the dispute: Jadar project and environmental protests The British-Serbian activist group Earth Thrive has reported that Rio Tinto has officially notified the Serbian...

There is no technology that guarantees the safe processing of lithium in the form it exists in Serbia

The Rio Tinto lithium mining project has never been conclusively dismissed, just paused, waiting for the dust to settle before being reintroduced with even...

“Jadar” will not pollute river streams

As the discussion about the "Jadar" project has reignited in recent days, the public in Serbia remains confused by the extremely contradictory narratives about...

Serbia’s lithium mining revival: Implications for EU membership and geopolitics

Serbia is aiming to position itself as a significant supplier of lithium in Europe, reviving a contentious mining project that was previously abandoned due...
Supported by
Supported by
Supported by
error: Content is protected !!